Courses

Sanitary Sewer Collection Works (Arabic)

Sanitary Sewer Collection Works (Arabic)
120 USD 120 USD
  Buy Now
Lessons
53 Lessons in 6 Chapters
Duration
27 Hours & 29 Minutes
Students
70 Students in 9 Countries
Instructor
Eng. Ali Fathy Senior Civil Engineer
Learn How to Design a sanitary sewer collection works from basics to expert to handle a full study for a project includes various design standards & Peak equations through five case studies:
1. One Peak Equation Project (Includes 1 ps & trans line)
2. Multiple Peak Equations for the same activity 
3. Seperated sanitary collection works( 2 (1. grey 2. black))
4. Transmission Line with high Three Points (Special Case)
5. Property House Connection
6. BOQ & Report
Course Curriculum
  Expand All     Collapse All
01-01 - Overview About Sewer System
 0:28:18
01-02 - Sewer Consumption
 0:34:42
01-03 - Seperated Vs Combined
 0:27:00
01-04 - Design Standards
 0:27:00
01-05 - Design Equations
 0:27:24
01-06 - Pressurized Equations
 0:29:12
01-07 - Pumping System
 0:32:06
01-08 - Pump Performance
 0:26:12
01-09 - Parallel and series Pumping
 0:37:54
01-10 - Overview of Valves
 0:34:24
01-11 - Valve Performance
 0:30:12
01-12 - Control Valves
 0:30:00
01-13 - Wet Well & Dry Well PS
 0:21:24
02-01 - Design Standards Egyptian
 0:33:06
02-02 - Alignment of Sewer Networks in Center of Road
 0:29:30
02-03 - Trex Vs DTM
 0:26:18
02-04 - ModelBuilder
 0:47:06
02-05 - Calculate Consumptions
 0:42:30
02-06 - Insert Consumptions
 0:34:24
02-07 - Define Peak Factor
 0:36:36
02-08 - Define Design Considerations1
 0:29:42
02-09 - Define Design Considerations2
 0:25:24
02-10 - Conduit Catalogue Definition
 0:26:36
02-11 - RUN & Modify Design
 0:30:12
02-12 - Local Pipe Constraints for Main1
 0:32:06
02-13 - Local Pipe Constraints for Main2
 0:30:12
02-14 - Design Standards KSA
 0:24:12
02-15 - Design Standards USA
 0:05:42
02-16 - Double Roadside Alignment
 0:22:12
02-17 - Insert Consumptions
 0:30:30
02-18 - Design Standards Egyptian
 0:30:00
02-19 - Design Standards KSA & USA
 0:30:18
02-20 - Query Builder
 0:23:18
02-21 - Pumping System & Relabelling
 0:27:42
02-22 - Pipe2CAD
 0:23:30
02-23 - Pumping System Editing
 0:34:00
02-24 - Generating Profiles & Solving Intersections
 0:39:00
02-25 - Query Builder for BOQ
 0:45:48
03-01 - Alignment
 0:28:12
03-02 - Build Surface
 0:26:12
03-03 - Classify Activity & its Consumption
 0:12:18
03-04 - Define Consumption
 0:43:12
03-05 - Design using peak equation
 0:28:06
03-06 - Design Using Multiple peak equations
 0:47:18
04-01 - Alignment of BS & GS Networks
 0:30:00
04-02 - Build Surface & Models
 0:36:48
04-03 - Define Consumption & Constraints
 0:36:30
04-04 - Design for BS & GS Networks
 0:39:18
04-05 - Modify for Solving Clashes
 0:43:24
04-06 - Generating Profiles
 0:28:36
05-01 - Sewer Pumping Transmission Line Redesign
 0:40:06
05-02 - Working & Operating Scenarios
 0:31:00
05-03 - Sewergems to Watergems & vice versa
 0:32:36
Sorry, no content is currently available