Courses

Full Wet Utilities Design

Full Wet Utilities Design
500 USD 360 USD
  Buy Now
Lessons
301 Lessons in 21 Chapters
Duration
137 Hours & 22 Minutes
Students
161 Students in 14 Countries
Instructor
Eng. Ali Fathy Senior Civil Engineer
Preliminary & Detailed Studies & Modeling of Sewer Collection Works
Preliminary & Detailed Studies & Modeling of Stormwater Collection Works using IDF & SCS Methods
Preliminary & Detailed Studies & Modeling of Combined Sewer (Stormwater+Sanitary) Collection Works using IDF & SCS Methods
Preliminary & Detailed Studies & Modeling of Water, Irrigation, & Firefighting Collection Works
Course Curriculum
  Expand All     Collapse All
01-01 - Introduction
 0:30:36
01-02 - Overview of water supply system
 0:39:00
01-03 - Types of Distribution networks
 0:17:48
01-04 - Pipe properties
 0:30:42
01-05 - Reservoirs & Tanks Overview
 0:30:42
01-06 - Velocity Regimes & Reynolds Number
 0:30:54
01-07 - Fluid Fundamentals
 0:29:00
01-08 - Friction Losses
 0:31:00
01-09 - Minor Losses
 0:31:00
01-10 - Energy Conservation
 0:31:00
01-11 - Example1 - P1
 0:32:00
01-12 - Example1 - P2
 0:34:00
01-13 - Example1 - P3
 0:34:00
01-14 - Pump - 1
 0:34:00
01-15 - Pump-2
 0:31:00
01-16 - Pump-3
 0:32:00
01-17 - Pump-4
 0:25:00
01-18 - Pump-5
 0:25:00
01-19 - Valves-1
 0:21:00
01-20 - Valves-2
 0:31:00
01-21 - Example2
 0:33:00
01-22 - Cavitation in Valves
 0:30:00
01-23 - Valves-3
 0:30:00
01-24 - Integration Between Network Components
 0:29:00
01-25 - Cavitation Example3 - P1
 0:28:00
01-26 - Cavitation Example3 - P2
 0:28:00
01-27 - Tanks-1
 0:26:00
01-28 - Tanks-2
 0:29:00
01-29 - Tanks-3
 0:29:00
01-30 - Tanks-4
 0:29:00
01-31 - Tanks-5
 0:30:00
01-32 - Tanks-6
 0:30:00
01-33 - Example4
 0:23:00
01-34 - Example4-P1
 0:30:00
01-35 - Example4-P2
 0:31:00
01-36 - Example4-P3
 0:31:00
01-37 - Water Quality inside Tanks
 0:44:00
01-38 - Water Meters P1
 0:32:00
01-39 - Water Meters P2
 0:32:00
01-40 - Backflow Prevention
 0:31:00
01-41 - Irrigation P1
 0:32:00
01-42 - Irrigation P2
 0:23:00
01-43 - Irrigation P3
 0:32:17
01-44 - Irrigation P4
 0:28:30
02-01 - Piping Sh1
 0:44:00
02-02 - Piping Sh1 contd.
 0:39:00
02-03 - Pumps Sh2
 0:28:00
02-04 - Pumps Sh2 contd.
 0:38:00
02-05 - Tanks sh3
 0:32:00
02-06 - Solving Loops Sh4
 0:30:00
02-07 - Solving Loops Sh4 Contd.
 0:28:00
02-08 - Valves & Transmission Line
 0:49:00
03-01 - Modelling fundamentals P1
 0:14:12
03-02 - Modelling fundamentals P2
 0:13:48
03-03 - Numerical Problems P1
 0:14:06
03-04 - Numerical Problems P2
 0:16:53
03-05 - Model Data
 0:14:48
03-06 - The Modeling Process
 0:15:18
03-07 - Model Construction P1
 0:15:42
03-08 - Model Construction P2
 0:18:12
03-09 - Model Construction P3
 0:17:12
03-10 - Scenarios
 0:21:00
03-11 - Alternatives
 0:18:12
03-12 - Overview of Modelbuilder, loadbuilder, & Trex
 0:16:12
03-13 - Modelbuilder using GIS & Excel
 0:18:42
03-14 - Adjust Synchronize out & in Modelbuilder
 0:19:54
03-15 - ModelBuilder
 0:17:36
03-16 - ModelBuilder Contd. & Trex
 0:20:12
03-17 - Loadbuilder
 0:17:30
03-18 - Create Surface
 0:15:06
03-19 - Difference between Trex Input files Accuracy
 0:15:06
03-20 - Modelbuilder Contd. + Loadbuilder
 0:21:18
03-21 - Loadbuilder by Proportional Distribution
 0:08:30
03-22 - Solving Modelbuilder Issues1
 0:14:12
03-23 - Solving Modelbuilder Issues2
 0:14:54
03-24 - Model Application and System Planning
 0:14:54
03-25 - Master Planning Using Software Concept
 0:13:54
03-26 - Rehabilitation Studies & Operational Studies Concept
 0:15:00
03-27 - System Reliability & Software Capabilites 1
 0:15:12
03-28 - Software Capabilites 2
 0:17:06
03-29 - Software Capabilites 3
 0:18:00
03-30 - Software Capabilites 4
 0:18:00
03-31 - Software Capabilites 5
 0:17:00
03-32 - Software Capabilites 6
 0:17:54
03-33 - Software Capabilites 7
 0:20:06
03-34 - Software Capabilites 8
 0:19:00
03-35 - Software Capabilites 9
 0:18:24
03-36 - Software Capabilites 10
 0:16:36
03-37 - Software Capabilites 11
 0:16:42
03-38 - Software Capabilites 12
 0:16:12
03-39 - Software Capabilites 13
 0:14:54
03-40 - Software Capabilites 14
 0:14:42
03-41 - Software Capabilites 15
 0:15:06
03-42 - Software Capabilites 16
 0:15:24
03-43 - Software Capabilites 17
 0:16:36
03-44 - Software Capabilites 18
 0:19:00
03-45 - Software Capabilites 19
 0:17:42
03-46 - Software Capabilites 20
 0:22:12
03-47 - Software Capabilites 21
 0:12:24
03-48 - Software Capabilites 22
 0:20:00
03-49 - Software Capabilites 23
 0:15:30
03-50 - Software Capabilites 24
 0:22:24
04-01 - Design Steps Part 01
 0:29:42
04-02 - Design Steps Part 02
 0:29:42
04-03 - Design Steps Part 03
 0:26:36
04-04 - Design Steps Part 04
 0:26:36
04-05 - Design Steps Part 05
 0:27:06
04-06 - Design Steps Part 06
 0:31:48
04-07 - Design Steps Part 07
 0:31:48
04-08 - Preparing Data & Alignment for Pro1 (Tanks) P1
 0:31:48
04-09 - Preparing Data & Alignment for Pro1 (Tanks) P2
 0:35:00
04-10 - Preparing Data & Alignment for Pro1 (Tanks) P3
 0:31:48
04-11 - Solving Issues, Prototypes & Batch Morph
 0:31:48
04-12 - Scenarios & Alternatives P1
 0:46:42
04-13 - Scenarios & Alternatives P2 & Demand Configuration
 0:28:30
04-14 - Control Sets & Design Varaibles P1
 0:28:30
04-15 - Control Sets & Design Varaibles P2
 0:31:00
04-16 - Control Sets & Design Varaibles P3
 0:31:00
04-17 - Control Sets & Design Varaibles P4 & Skeltonization
 0:19:00
04-18 - Demand Configuration P1
 0:29:00
04-19 - Demand Configuration P2
 0:19:36
04-20 - Demand Configuration P3
 0:28:18
04-21 - Demand Configuration P4
 0:28:18
04-22 - Pipe Sizing P1
 0:24:30
04-23 - Surface P1
 0:28:18
04-24 - Surface P2 & Fireflow Analysis P1
 0:28:18
04-25 - Fireflow Analysis P2 & Pipe Sizing P2
 0:30:12
04-26 - Option 1
 0:24:18
04-27 - Option 2
 0:22:36
04-28 - House Connection & Customer Meters P1
 0:28:48
04-29 - House Connection & Customer Meters P2
 0:27:24
04-30 - House Connection & Customer Meters P3
 0:25:12
04-31 - House Connection & Customer Meters P4
 0:18:36
04-32 - House Connection & Customer Meters P5
 0:32:17
04-33 - House Connection & Customer Meters P6
 0:33:30
04-34 - House Connection & Customer Meters P7
 0:12:42
04-35 - House Connection & Customer Meters P8
 0:35:00
04-36 - House Connection & Customer Meters P9
 0:37:48
04-37 - Valves Distribution Overall Networks
 0:30:54
04-38 - End of Project
 0:23:06
05-01 - Design Criteria
 0:23:06
05-02 - Model Building P1
 0:29:42
05-03 - Model Building P2
 0:29:18
05-04 - Sizing Tank as Per Unit Activity
 0:29:42
05-05 - Achieving to Model Equalibrium P1
 0:31:24
05-06 - Achieving to Model Equalibrium P2
 0:39:48
05-07 - Achieving to Model Equalibrium P3
 0:32:12
05-08 - Achieving to Model Equalibrium P4
 0:28:18
05-09 - Achieving to Model Equalibrium P5
 0:28:10
05-10 - Achieving to Model Equalibrium P6
 0:23:24
05-11 - The End of Project 2
 0:25:00
06-01 - Preparing Software
 0:05:36
06-02 - Preliminary studies & Alignment P1
 0:38:06
06-03 - Alignment P2 & ModelBuilder
 0:25:12
06-04 - Fixing Alignment Issues P1
 0:10:12
06-05 - Fixing Alignment Issues P2
 0:06:48
06-06 - Demand forecasting (Calculations) P1
 0:30:06
06-07 - Demand forecasting (Calculations) P2
 0:31:18
06-08 - Surface
 0:31:00
06-09 - Design Steps (Alignment) P3
 0:26:54
06-10 - Design P1
 0:27:48
06-11 - Design P2
 0:27:48
06-12 - Design P3
 0:32:00
06-13 - Design P4
 0:30:30
06-14 - Design P5
 0:29:54
06-15 - Design P6
 0:26:30
06-16 - Design (Controls) P7
 0:26:36
06-17 - Design (Controls) P8
 0:26:24
06-18 - Design P9
 0:37:30
06-19 - Design P10
 0:15:30
06-20 - Design P11
 0:36:06
06-21 - Design P12
 0:33:54
06-22 - Design P13
 0:22:00
06-23 - The End of Project 3
 0:23:42
07-01 - Standards & Requirements for Drawings
 0:37:00
07-02 - Assigning Valve Chambers
 0:27:00
07-03 - Prepare Alignment For Profiles
 0:22:00
07-04 - Using SewerGems for Better Profiles Generations
 0:33:00
07-05 - Using Civil 3D for Preparing Modelbuilder1
 0:24:00
07-06 - Using Civil 3D for Preparing Modelbuilder2
 0:28:00
07-07 - Pipe2CAD
 0:24:00
08-01 - Alignment P1
 0:15:42
08-02 - Modelbuilder & Definitions P1
 0:16:42
08-03 - Modelbuilder & Definitions P2
 0:13:00
08-04 - The End of Project 4
 0:12:54
09-01 - Alignment
 0:31:54
09-02 - Demand Forecasting
 0:33:42
Sorry, no content is currently available
12-01 - Overview About Sewer System
 0:28:18
12-02 - Sewer Consumption
 0:34:42
12-03 - Seperated Vs Combined
 0:27:00
12-04 - Design Standards
 0:27:00
12-05 - Design Equations
 0:27:24
12-06 - Pressurized Equations
 0:29:12
12-07 - Pumping System
 0:32:06
12-08 - Pump Performance
 0:26:12
12-09 - Parallel and series Pumping
 0:37:54
12-10 - Overview of Valves
 0:34:24
12-11 - Valve Performance
 0:30:12
12-12 - Control Valves
 0:30:00
12-13 - Wet Well & Dry Well PS
 0:21:24
13-01 - Design Standards Egyptian
 0:33:06
13-02 - Alignment of Sewer Networks in Center of Road
 0:29:30
13-03 - Trex Vs DTM
 0:26:18
13-04 - ModelBuilder
 0:47:06
13-05 - Calculate Consumptions
 0:42:30
13-06 - Insert Consumptions
 0:34:24
13-07 - Define Peak Factor
 0:36:36
13-08 - Define Design Considerations1
 0:29:42
13-09 - Define Design Considerations2
 0:25:24
13-10 - Conduit Catalogue Definition
 0:26:36
13-11 - RUN & Modify Design
 0:30:12
13-12 - Local Pipe Constraints for Main1
 0:32:06
13-13 - Local Pipe Constraints for Main2
 0:30:12
13-14 - Design Standards KSA
 0:24:12
13-15 - Design Standards USA
 0:05:42
13-16 - Double Roadside Alignment
 0:22:12
13-17 - Insert Consumptions
 0:30:30
13-18 - Design Standards Egyptian
 0:30:00
13-19 - Design Standards KSA & USA
 0:30:18
13-20 - Query Builder
 0:23:18
13-21 - Pumping System & Relabelling
 0:27:42
13-22 - Pipe2CAD
 0:23:30
13-23 - Pumping System Editing
 0:34:00
13-24 - Generating Profiles & Solving Intersections
 0:39:00
13-25 - Query Builder for BOQ
 0:45:48
14-01 - Alignment
 0:28:12
14-02 - Build Surface
 0:26:12
14-03 - Classify Activity & its Consumption
 0:12:18
14-04 - Define Consumption
 0:43:12
14-05 - Design using peak equation
 0:28:06
14-06 - Design Using Multiple peak equations
 0:47:18
15-01 - Alignment of BS & GS Networks
 0:30:00
15-02 - Build Surface & Models
 0:36:48
15-03 - Define Consumption & Constraints
 0:36:30
15-04 - Design for BS & GS Networks
 0:39:18
15-05 - Modify for Solving Clashes
 0:43:24
15-06 - Generating Profiles
 0:28:36
16-01 - Sewer Pumping Transmission Line Redesign
 0:40:06
16-02 - Working & Operating Scenarios
 0:31:00
16-03 - Sewergems to Watergems & vice versa
 0:32:36
17-01 - Alignment & building
 0:16:12
17-02 - Batch Morph for House connection
 0:16:06
17-03 - Load Builder
 0:17:00
17-04 - Final Design & Output
 0:16:06
18-01 - Introduction to Stormwater Collection Works
 0:30:30
18-02 - Definitions
 0:31:48
18-03 - Time of Concentration + CB types & Distribution
 0:31:06
19-01 - Gutters & Conduits
 0:26:48
19-02 - Statistical analysis & Generating IDF Curve
 0:21:18
19-03 - Statistical Fundamentals
 0:34:30
20-01 - Hyfran Vs Excel
 0:39:54
20-02 - Finding High & Low Points in Urban Planning
 0:30:12
20-03 - Flowmaster & CB Selection & Distribution Using IDF
 0:31:36
20-04 - Inlet on Grade & In Sag & Alignment
 0:31:36
20-05 - Trex Vs DTM
 0:30:54
20-06 - Power Inroads
 0:31:06
20-07 - Prepare Prototypes For ModelBuilder
 0:33:24
20-08 - ModelBuilder Error & Solutions
 0:23:42
20-09 - Alignment of Sewer Networks in Center of Road
 0:29:54
20-10 - Alternatives & Scenarios
 0:29:54
20-11 - CB Distribution
 0:30:42
20-12 - On Grade In Sag
 0:31:42
20-13 - Multiple Solutions By Batch Run
 0:42:12
20-14 - Flowmaster
 0:31:48
20-15 - Multiple Design Standards
 0:33:12
20-16 - Optimization & Symbology
 0:32:24
20-17 - SCS fundamentals
 0:44:30
20-18 - Preparing SCS Scenarios
 0:38:30
20-19 - Results
 0:27:36
20-20 - Routing & Calculate Volume for Decrease Impact
 0:18:48
20-21 - Developed Planninig 1
 0:30:18
20-22 - Developed Planninig 2
 0:30:36
20-23 - Developed Planninig 3
 0:31:18
20-24 - Culverts Fundamentals1
 0:32:42
20-25 - Culverts Fundamentals2
 0:32:54
20-26 - SCS Scenario 2
 0:35:36
20-27 - Ponds Fundamental
 0:33:06
20-28 - Pump Stations Fundamentals
 0:34:12
20-29 - Outfalls Fundamentals
 0:41:36
20-30 - Pumping Systems
 0:37:00
20-31 - Pumps Fundamentals1
 0:32:06
20-32 - Pumps Fundamentals2
 0:26:12
20-33 - Pump Performance
 0:37:54
20-34 - Valves
 0:34:24
20-35 - Control Valves1
 0:30:12
20-36 - Control Valves2
 0:30:00
20-37 - Wet & Dry Wells
 0:21:24
20-38 - Weirs & Design Pond Using Elevation Area Method
 0:30:00
20-39 - Design Pond Using Elevation Area Method1
 0:31:00
20-40 - Sizing Outfall Structure
 0:26:36
20-41 - Check Design
 0:34:42
20-42 - Sizing PUMP Stations
 0:28:18
20-43 - Pump Selection
 0:28:54
20-44 - Sizing Well
 0:30:24
20-45 - BOQ1
 0:25:06
20-46 - BOQ2
 0:23:54
21-01 - Surface Drainage Fundamentals
 0:31:18
21-02 - Define Drainage Sections1
 0:26:12
21-03 - Define Drainage Sections2
 0:24:36
21-04 - Alignment , Modelbuilder & Theisen Polygon
 0:24:48
21-05 - Final Model for Center Ditch & two sides alignments
 0:15:24